The Construction of the Orillia Power Plant at Minden
December 3, 2025

The Orillia Power Plant at Minden
Originally Published in the Fenelon Falls Gazette, November 22, 1934
“The progress made by the contractors is most impressive. Everywhere there is evidence that they are thoroughly familiar with their job, and know just how to go about getting the best results. A large amount of equipment has been assembled on the site to facilitate the work. Two huge steel cranes raise their booms skyward and lift the buckets of earth and rock about like chips. Rails are being laid, along which the materials will be run into place in cars by a small steam engine. A huge mixing plant is under construction, so placed that the cranes can carry the cement to the dam and power house. It will be closed in to facilitate keeping the mixture warm with steam. Already materials are being assembled, including twenty tons of cement, stored in a building erected for the purpose. The office is in a house which was on the site, and was bought by the Commission, and which suits the purpose admirably.
A large part of the earth excavation, both for the dam and power house has been done. It is hoped to get this completed before heavy frost sets in. The rock excavation and laying of cement, it was explained, can be done in cold weather, rather than the digging of earth. A beginning is also being made in assembling gravel and sand for the cement work. These have been found in the vicinity, though there is not much suitable material available, but enough, fortunately, for the present work.
There are about 150 men at work, including those engaged in constructing the road. Upwards of 100 of these are from Orillia. The crane operators, the dynamite gang, the foreman and a few others filling posts requiring experience are regular employees of the Dominion Construction Corporation. The majority of the men working on the road come from the vicinity of Minden, in accordance with the understanding. There are, the writer was assured, no other outsiders. The Town Council and Commission send a man over at intervals, to check up and see that this is the case. The men are doing very satisfactory work.
The men are quartered in bunk houses built beside the plant. There is a large dining hall, where excellent meals are served. The Packet and Times representatives can testify to this from personal experience. As to quality, quantity and variety, nothing better could be asked for. The cook, Joseph English, has been working for the Company, at intervals for twenty-eight years, and knows the business thoroughly. Every care is taken to keep the men healthy. The water, which is pumped up from the river into a stand pipe is chlorinated. A bath house has been built with shower baths and hot and cold water.
Meantime work on the pole line is being pushed, under the superintendence of Mr. H. Caswell. Here forty or fifty men are employed, them majority are from Orillia, but about forty percent drawn from the townships through which the line passes. By acquiring right-of-ways across farms, the length of the line has been reduced about five miles to a total of 47 miles. This also voids turns and so reduces the cost of construction and in one stretch the line runs straight for nine miles. Through Mara the line follows the road. The work of cutting the right-of-way through the bush sections is now under way. Mr. Ernest Vavana is engaged in locating the poles. It is anticipated that the line will take six months to construct.”