Fenelon Canal Reconstruction, 1963
Fenelon Falls
Maryboro Lodge Collection
Fenelon Canal Reconstruction, 1963
When the Trent Severn Waterway rebuilt the Fenelon Falls lock in 1963 as one stage instead of two, a swing bridge was no longer needed, because the boats would now be low enough to pass under the bridge. A concrete bridge was then constructed. W.G. Jackett & Sons performed the excavation.
Fenelon Falls
Maryboro Lodge Collection
© Copyright 2023 - Maryboro Lodge Museum