View all Archives

Fenelon Canal Reconstruction, 1963

When the Trent Severn Waterway rebuilt the Fenelon Falls lock in 1963 as one stage instead of two, a swing bridge was no longer needed, because the boats would now be low enough to pass under the bridge. A concrete bridge was then constructed. W.G. Jackett & Sons performed the excavation.

Fenelon Falls

Maryboro Lodge Collection

© Copyright 2022 - Maryboro Lodge Museum